St. Luke's Anderson Expansion
The St. Luke’s Anderson Expansion project consists of a newly constructed birthing center located in Easton, PA.
The St. Luke’s Anderson Expansion project is a newly constructed birthing center consisting of 50 patient rooms, 2 operating rooms, 9 labor & delivery rooms, and 26 NICU bays. Worth & Company completed the HVAC, Plumbing, and Medical Gas Piping on this project. Distribution throughout the building was achieved via (2) 450 Ton Trane Centrifugal Chillers, (1) 150 Ton Water Cooled Heat Recovery Chiller, (1) REYMSA Cooling Tower, (3) Fulton Boilers, (1) AnnexAir Heat Recovery Unit, (10) Trane Custom Air Handling Units, and (2) Trane Rooftop Units.
Scope of Project:
- HVAC Piping
- Sheet Metal
- Med Gas Piping
- Plumbing
Mechanical Equipment:
- (2) 450 Ton Trane Centrifugal Chillers
- (1) 150 Ton Water Cooled Heat Recovery Chiller
- (1) REYMSA Cooling Tower
- (3) Fulton Boilers
- (1) AnnexAir Heat Recovery Unit
- (10) Trane Custom Air Handling Units
- (2) Trane Rooftop Units.
Description of Relevancy/Project Facts:
- Over 200,000 LBS of Ductwork
- Over 25,000 LF of Mechanical Piping and 225 Hot Water Coils
- Over 54,000 LF of Plumbing Piping and 585 Fixtures
- Over 17,000 LF of Medical Gas Piping and over 650 Medical Outlets
- Large Prefabricated Mechanical Room (7,600 SF)
- 3D BIM Coordination
Related Approaches
- Design-Assist
- Pre-Construction
- Virtual Design & Construction (VDC)
Related Attributes
- Award Winner
- Fabrication
Testimonials
New Business Inquiries
Please reach out to discuss your project, and learn more about our Mechanical capabilities.