Mechanical

LVHN Hecktown Oaks

Easton, PA

The Lehigh Valley Hospital – Hecktown Oaks project consists of a newly constructed, 201,000 square foot facility located in Easton, PA.

Owner

Lehigh Valley Health Network

Engineer

Erdman Architecture, LLC

Architect

Erdman Architecture, LLC

Size

201,000 SF

Value

$14,000,000

Completion Year

2021

Market Sectors

As the first hospital Lehigh Valley Health Network has opened in 50 years, LVHN Oaks proudly resides just off Route 33 in Easton, Pennsylvania and includes a 201,000 square foot hospital with Emergency Room that holds 20 emergency room bays, 4 bays dedicated just for children, and 8 observation beds. It also has an inpatient unit with 20 private rooms, each with private bathrooms, telehealth capabilities and a 55-inch flat screen television in every room. The hospital features 4 state-of-the-art surgical suites, breast health services, a joint and spine center, an outpatient rehab, family medicine, and Lehigh Valley Heart Institute cardiology and cardiac diagnostics.

Worth & Company worked closely with the general contractor to provide the HVAC, Plumbing, and Medical Gas installation for the LVHN Hecktown Oaks hospital. The Worth team supported the project from conceptual estimating through project completion by utilizing its advanced capabilities and vast resources.

Worth & Company faced the ultimate challenge of the worldwide shutdown due to COVID-19 just as this project was set to mobilize. Having an already tight schedule planned for this project, COVID-19 created even more logistic hurdles throughout the project.

With all the focus on the lead times and obtaining material, the utilization all of Worth’s innovative technology of Computer Automated Drafting (CAD) and Building Information Modeling (BIM) as well as making good use of Worth’s advanced prefabrication and pre-assembly capabilities allowed for overcoming logistic hurdles and kept the schedule of the project on target.

Amidst the logistical issues and coordination complications of COVID-19, Worth still maintained our standards of safety and installation and was able to deliver the project on time.

Related Approaches

  • Design-Assist
  • Pre-Construction
  • Virtual Design & Construction (VDC)

Related Attributes

  • Award Winner
  • Fabrication

Testimonials

Worth was involved as a design-assist partner from the very early stages of design development, offering their expertise to help value engineer and refine the design of the mechanical and plumbing systems in the hospital. This project had many challenges, including the addition of two new suites in the final months of construction. Worth took these challenges in stride, collaborating with LVHN, Whiting-Turner, and the design team to work through areas of concern, realize the Owner’s vision, and deliver on their promise to have the Campus open on time.

Karl Bauer
Project Manager, The Whiting-Turner Contracting Company

New Business Inquiries

Please reach out to discuss your project, and learn more about our Mechanical capabilities.

Our Website uses cookies. Cookies are small text files held on your computer that help us understand how you use our Website. Our cookies do not store any personal information about you, and you can delete and block cookies via your browser settings at any time. By clicking “Ok” you agree to accept our use of cookies. Learn more by reviewing our privacy policy.